- Bhayandar: A view of the newly installed 65-meter-long composite steel girder for Mumbai Metro Line 9 in Bhayandar on Friday, June 13, 2025. The installation was carried out during a limited night block with the support of heavy cranes and seamless inter-agency coordination. Metro Line 9, which connects Dahisar (East) to Mira-Bhayandar, is currently 95% complete. (Photo: IANS/MMRDA)
- Bhayandar: A view of the newly installed 65-meter-long composite steel girder for Mumbai Metro Line 9 in Bhayandar on Friday, June 13, 2025. The installation was carried out during a limited night block with the support of heavy cranes and seamless inter-agency coordination. Metro Line 9, which connects Dahisar (East) to Mira-Bhayandar, is currently 95% complete. (Photo: IANS/MMRDA)
Facebook Comments
About SocialNewsXYZ
An Indo-American News website. It covers Gossips, Politics, Movies, Technolgy, and Sports News and Photo Galleries and Live Coverage of Events via Youtube. The website is established in 2015 and is owned by AGK FIRE INC.

